Rebuilds and Repairs
Unfortunately units fail. Sometime they can be repaired at the customers own
site, when the failure is too bad it may mean that the unit will have to be
removed and taken back to our extensively equipped workshops in Dagenham, Essex.

From removal of a diverter or complete selector switch to the full removal of the
On Load
Tap Changer (OLTC), Global Power UK Limited has the solution to minimise unit down
time and provide a quality repair.

<<<
An ATL type HS selector being removed Ready for
re-installation>>>


<<<<Fuller
F
OLTC as received in our works
and now ready for
re-installation >>>>>